
Back in Top Form After Two Decades
The GD Mobile Lifting Jacks Reimagined

After 22 years of service, a 12-column GD mobile lifting jacks operating at a Budapest metro depot has undergone a comprehensive modernization.
Back in 2004, GD Gép és Daru Kft. supplied both a 12-column and a 20-column mobile lifting jacks to one of Budapest's metro maintenance facilities. After more than two decades of reliable operation, the time had come to fully refurbish and upgrade the 12-column system.
What makes this project unique is that it was far more than a standard refurbishment. GD transformed the lifting system with a completely new control platform and modern engineering solutions, extending its operational life while bringing it up to current technological standards.
From Engineering to Manufacturing – Under One Roof

Modern Control System, Maximum Control
At the heart of the new solution is a Siemens SIMATIC S7-1500F safety PLC, responsible for the safe and synchronized operation of the system.
Operators can monitor lifting column status, position, load data, and system alarms through a central HMI interface. In addition, each lifting column is equipped with its own control cabinet and local HMI panel.
The system offers two primary operating modes:
- Individual Mode: lifting columns can be positioned independently to match vehicle lifting points.
- Group Mode: selected lifting columns operate in a synchronized manner as one coordinated system.
The control system continuously monitors column positions and height differences between lifting units. In the event of abnormalities such as end-stop activation, obstruction, lifting nut wear, encoder failure, or communication faults, the system initiates a safety shutdown.
Web-Based Monitoring from Anywhere

The upgraded control system also includes a web-based monitoring platform, providing additional visibility into system operation and condition.
Control system data is available in a structured format, making it easier to track equipment status, operating events, and fault messages.
For equipment where availability and operational safety are critical, this capability offers significant value. The modern control system not only manages the lifting process but also provides continuous insight into system performance.
One System, Up to Three Metro Cars
The 12-column system can be configured with four lifting columns to lift a single metro car, while the complete setup can handle up to three cars simultaneously.
The control architecture is also scalable up to 20 lifting columns, enabling the handling of up to five metro cars and providing flexibility for future operational requirements.
Safety is further enhanced through a Hold-to-Run operating principle. Lifting or lowering movements can only be performed while a physical pushbutton is continuously pressed. Releasing the button immediately stops movement, and direct motion commands cannot be initiated from the HMI.
More Than Refurbishment – A Value-Adding Modernization
The service life of industrial lifting equipment does not necessarily end when its original control system or mechanical components become outdated.
A properly engineered modernization can provide an entirely new lifecycle for an existing asset.
This project demonstrates one of GD Gép és Daru Kft.’s core strengths: combining decades of engineering expertise with modern technology to maximize the value of existing lifting equipment. In addition to designing and manufacturing new systems, the company successfully modernizes and upgrades installed equipment, enhancing safety, functionality, reliability, and overall performance.
After 22 years, the equipment still proudly bears the GD hallmark. Equipped with a new control system and modern technology, it is ready to serve reliably for many years to come.